Saturday, November 22, 2008
Progress on vacation
Today I have quilted two quilts so far. I hope to get another two done today and maybe even two every day this week. That would really help me catch up on the number of quilts that need quilting and put that stack right back on the cutting table! I have two that need binding from the old stack. I'd like to get all of the quilt tops out of here before the new year starts so I can begin with a clean slate, but I think that is almost impossible. I think I have over 50 quilt tops waiting. I worked last week on matching backing fabric to the quilt tops and I think I have about 10 paired up. Feels good to be making some progress.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment