Sunday, September 23, 2012
catching up
I'm behind schedule for my goal of 100 quilts by the end of the year and need to kick my butt into gear. I did some cleaning, some bobbin winding and bound a quilt. Time for quilting. I have 8 more quilt tops that are already matched with backing fabric so I should get those done before spending more time and effort matching tops to backs. That usually takes a while because the piece I want to use doesn't always have enough fabric. But, I do love seeing my pile of fabric get a tiny bit smaller as I pick out backing fabric.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment